Explored with @The Stig
History
This culvert was constructed, using concrete, between 1907-1911. This was to guide the Ouseburn underneath the suburb of Heaton. It runs for a total length of 2150 ft, at a cost of £23,000. The southern portal opens beneath the Ouseburn Viaduct, some of which has been paved over and is used for horse riding.
Under...
History
This culvert was constructed, using concrete, between 1907-1911. This was to guide the Ouseburn underneath the suburb of Heaton. It runs for a total length of 2150 ft, at a cost of £23,000. The southern portal opens beneath the Ouseburn Viaduct, some of which has been paved over and is used for horse riding.
![[IMG]](http://i3.thejournal.co.uk/incoming/article8810873.ece/ALTERNATES/s615b/JS58709961.jpg)
Under...
Byker Culvert, Newcastle - Apr '16